1393
Comment:
|
1012
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
* ''zibun'' project with Jeff | |
Line 14: | Line 15: |
* Install and configure [http://trac.edgewall.org/ Trac] and [http://http://bazaar-vcs.org/ Bazaar] Smart Server on WWW. It'd be nice to have a centralized trunk repository for all lab projects. Trac also has a project wiki and ticket tracking system. And plugins to support various VCSs, including built-in Subversion support. I actually have trac, trac-bzr, and trac-spamfilter installed, but not configured. |
Current Projects
- High Priority
[wiki:/LabScheduler Lab Scheduler]
- [wiki:/Resu1 Mayan experiment]
[wiki:/JapaneseAccusative Japanese を elision corpus study]
zibun project with Jeff
- Medium Priority
Learn more statistics. I bought a copy of [http://www.amazon.com/Analyzing-Linguistic-Data-Introduction-Statistics/dp/0521709180/ Analyzing Linguistic Data: A Practical Introduction to Statistics using R by Harald Baayen (2008)] and intend to work through it this summer with others that are interested.
- (Very) Low Priority
- Personal Projects
- These are not necessarily on work time, but things I'm also working on
- Improve my Japanese - try to spend 30 minutes at least twice a week studying
- Improve my GRE math score - try to spend at least 30 minutes at least twice a week studying